For every "what if" you have about packaging, we have an answer. jackzhao@briverglass.com
Quality is controlled through defined inspection gates—from incoming inspection to final packing—supported by dedicated testing capability, traceability, and documented corrective actions.
Quality Gates (IQC → Process → First Article → Final → Decoration QC)
Testing capability for CTQ features
Traceability & NCR handling
Our Quality Approach
We manufacture to confirmed specifications and golden samples. Quality is built into each stage through documented inspection gates, process checks, dedicated testing, and batch traceability—so results remain consistent at scale.
Quality Gates (Inspection Flow)
Incoming Quality Control (IQC)
All incoming materials and components are identified, sampled and verified before release to production. Lots are labeled (pending / approved / rejected) to prevent mix-up.
Key controls:
Document verification (as applicable)
Sampling with traceable sample ID
Lab/inspection verification and release decision
NCR issued for nonconforming lots
Outputs / records:
Incoming Inspection Record
Purchasing Inspection Sheet (if used)
NCR (if any)
In-Process Control (Shift Checks)
Shift-based checks monitor dimensional and appearance consistency during production. Issues are corrected early to protect yield and delivery.
Key controls:
Routine shift checks and hot inspection
Dimensional monitoring for CTQ features
Mold-to-mold consistency observation
Packaging audit to avoid mixed defects
Outputs / records:
Process Inspection Records
Shift Check Logs
First Article Approval (New Items / changes)
For new items and changeovers, first-article verification is performed before volume runs—especially for neck finish and capacity.
Key controls:
Key dimension verification (neck finish, height, brimful capacity)
Appearance checks (seam line, tilt, wobble, base seating)
Closure fit check (recommended when closure sample is provided)
Golden sample alignment for appearance reference
Outputs / records:
First Article Record
Sample Approval Record
Golden Sample Confirmation
Final Inspection (Before Packing / Shipment)
Finished goods are inspected to verify conformity to agreed specifications. Automatic inspection and dedicated tests are used where applicable.
Key controls:
Appearance and dimensional verification
Automatic inspection (if applied) + instrument checks
Batch identification and packing release
Outputs / records:
Final Inspection Report
Packing Release Record
Decoration QC (If Finishing Applies)
Decoration is verified through preparation control, parameter control, and final appearance checks to reduce batch variation.
Key controls:
Surface readiness verification
Process parameter control
Alignment and finish integrity check
Final appearance inspection before packing
Outputs / records:
Decoration QC Checklist
Appearance Approval Record
Critical-to-Quality (CTQ) Features for Spirits Bottles
Neck finish compatibility (closure fit & sealing)
Brimful capacity consistency (filling performance)
Verticality & stability (tilt / wobble control)
Wall & bottom thickness consistency
Internal stress control (reduce breakage risk)
Appearance consistency (surface, seams, defects)
Decoration readiness (adhesion & alignment if applicable)
Testing Capability (Verification Tests)
We verify key performance and consistency using dedicated instruments and gauges. Typical tests include:
Why it matters: These tests support batch consistency, filling-line compatibility, and transit safety.
Wall/Bottom Thickness
Impact Resistance
Sealing Performance
Internal Pressure / Burst
Thermal Shock
Verticality / Axial Deviation
Internal Stress
Dimensions / Weight / Height
Traceability & Records
We maintain batch identification and record-based verification across key stages. When an issue occurs, traceability supports efficient root-cause analysis and corrective action.
Typical records:
Batch/Lot identification on packing (as applicable)
Incoming inspection records
Process/shift check logs
First article & sample approvals
Final inspection and packing release records
NCR and corrective action records
Nonconformance (NCR) Handling & Corrective Actions
Nonconforming materials or products are isolated and handled through a documented NCR process. Actions may include rework, downgrade, replacement, or disposal—based on review and approval.
Identify
Quarantine
Review
Decision
Corrective action
Verification
Close
Third-Party Inspection & External Verification
Customers may arrange third-party inspection prior to shipment. External verification can also be used to confirm specific compliance or test scope when needed.
Claims & Customer Complaint Handling
We maintain batch identification and record-based verification across key stages. When an issue occurs, traceability supports efficient root-cause analysis and corrective action.
Recommended timelines (align with your sales contract):
Transit damage: within 7 days of receipt
Shortage/wrong items: within 10 days of receipt
Quality nonconformance: within 30 days of receipt (before further processing/use)
Latent defects: within 90 days of receipt
Evidence required: Photos/video, batch/lot details, defect rate, packing list, and samples upon request.
Remedies: Replacement / rework / credit note / refund for affected goods (after verification).
Need a Quality Document Set for Your Project?
Tell us your target market and product scope. We’ll provide the corresponding certificate/test-report list and a workable inspection plan.